Number TOPIC/ISSUE Sub-Issues/ Contents Lead/ Resources Comments
1 Protecting High Quality Water Resources Basin-wide issue
A few "stronghold" areas of good quality, but no inventory or program to protect them
How to prevent degradation?
Lee Daneker (LD), Mark Swartout (MS), Lori Morris (LM) Overriding theme of Plan
Draft complete, 1/30/03
STC review, 2/20/03
2 Protection of Areas with High Water Quality Easier to protect areas with good water quality than to clean up poor quality areas
Related to land use
Lee Daneker Draft complete, 1/30/03
STC review, 2/20/03
Water Quantity
3
Core Issues
Water Balance
Water Rights & Actual Use
Consumptive Use
Return Flows
Cynthia Carlstad (CC), LD Abbreviated format draft target date: 3/21/03
4 Groundwater-Surface Water Interaction Hydraulic Continuity
Possible new groundwater sources (for water supply)
CC, Terra Hegy (TH) Target date: 4/3/03
5 Water Availability Water availability for humans and instream flows CC, LD Input from Mark Swartout & Lee Napier on Comp. Plans & population estimates)
Target date: 4/3/03
6 Exempt Wells Agriculture use
Estimate of how much water is consumed by exempt well use in the Chehalis Basin
Ways to make these non-consumptive
Development impacts
Bob Wheeler, CC, Kahle (KJ), Terry Willis Target date: 3/21/03 (abbreviated format)
7 Flooding Existing information, historical perspective
Findings of Army Corps of Engineers study
LM, Beth Coffey,
Brian Peck (BP)
Draft complete for 3/6/03 STC meeting
2nd Draft discussion: 4/17/03
option Flood Damage Reduction Project LM Drafted by Lori Morris (unsolicited)
2nd Draft discussion: 4/17/03
Water Quality
8 Water Quality Management Problems: temperature, fecal coliform, dissolved oxygen, turbidity/sediments, gravel, NPDES/Point Sources, non-point sources
State water quality standards
Monitoring program
Failing septic systems
KJ,
BP
Impacts from: invasive species control agents, fecal coliform (seals)
Methods for addressing failing septic systems
Target date: 4/3/03
9 TMDL Basin-wide issue
Elements of a TMDL
Impacts on local communities
Options for controlling non-point pollution
Technical background
Solutions, recommendations
KJ, BP Is TMDL process working?
1st Draft done: 2/20/03
2nd Draft discussion: 3/21/03
Habitat
10 Habitat approach under 2514 Existing efforts: 2496, US Army Corps, etc.
Existing conditions, limiting factors
WDFW: Chad, Terra, Lori Morris, BP 1st Draft done: 2/20/03 (abbreviated format)
2nd Draft discussion: 3/21/03
11 Nutrients Nutrients as part of overall restoration approach
Nutrient restoration activities: objectives, protocol
J.H. Michael Jr. Draft complete, discussed 2/20/03
2nd Draft discussion: 3/21/03
Instream Flows
12 Instream Flows Regulatory flows: purpose, basin closure if regulatory minimum flow not met
How regulatory minimum flows have been used
Available data: base flows vs. actual
CC, Brad Caldwell, KJ, Terra, BP, LD How to meet ISF's if not being met, while still supplying water for people/communities?
1st Draft done: 2/20/03 (abbreviated format)
Water Storage
13 Water Storage Implications for water quantity, instream flows, flooding CC, BP Issue paper will be part of Storage Report (April)
Land Use
14 Land Use GMA (population density, protecting lands)
CWSPs
Water right transfers: should be possible w/o GMA impeding them
Stormwater: new development impacts (urban & rural), SWMM
Riparian areas/Critical/Sensitive Areas Ordinances, Shoreline Mgt. Act
Landscaping - Low Impact Dvlpt.
FPA, Ag., Fish & Water
Lee Napier, MS, KJ, BP, Triangle, Craig Swanson, Depts. of Ecology/Ag. (if possible) How to use improved remote sensing data?
LLogging/deforestation: can we predict effects of new forest practices over time?
Target date: 3/21/03
15 Stormwater Existing development KJ, Dept of Ecology (Gary Krueger) NPDES permits
Target date: 3/20/03
Implementation/ Governance/Process
16 Public Information Use of water (residential, commercial, industrial, agriculture)
Landowner tools
Consumer economics
Outreach/assistance for citizen projects
Chris Page, Citizen Adv. Committee What if: If we did x, what would results be?
Target date: 3/21/03
17 Measuring Success How? + Who?
Effectiveness monitoring
Adaptive management
Cost-benefit analysis
Triangle Funding
Target date: May 2003
18 Voluntary Agreements How to arrange?
What should volunteering entities do?
If not possible, how & when to create needed rules
Triangle Target date: May 2003
19 Management Framework Existing law/regulations
Who/what group will manage implementation?
Data management (+ ongoing studies & projects)
Funding
Implementation
Updates to Plan
Triangle (wait until Phase 4 findings/ funding to finalize this one) Target date: 3/21/03
Auxiliary Issues Water overuse
Saltwater intrusion
option Economic Value of Recreation LM Drafted by Lori Morris (unsolicited)
Discussion: 3/21/03




Back to Whats New Index Page
Back to CRC Index Page
Back to Watershed Index Page

This page created and maintained by Chehalis River Council
Send comments or questions to the: Chehalis River Council

Now, you can Search this  Chehalis River Council site!