Chehalis Basin Partnership Meeting Notice and Agenda
DATE: Friday January 25, 2008
TIME: 9:30am to 12:00p.m.
LOCATION: Chehalis Tribe “Lucky Eagle” Casino (Directions on Back)
|
A. General Partnership Business |
Estimated start time |
Discussion Lead |
|
1. Welcome, introductions and roundtable comments |
9:30 am |
Chair Bonnie Canaday |
|
2. Discuss and adopt draft meeting summaries for November 16th meeting and December 21st meeting |
9:40 am |
Chair |
|
B. Special Projects and Presentations |
WMP or DIP Implemented |
Estimated Start Time |
Discussion Lead |
|
1. Hydrogeology Analysis by Joel Massmann for the Quinault Indian Nation.
|
DIP I.M 1.2 Measuring to Manage Water Quantity |
9:45 am |
Joel Massman
|
|
2. Post Flood Update/Feedback
|
WMP and DIP |
11:00am |
Mark Swartout |
C. Closing comments and Chair Adjourns Meeting 11:45 am
From I-5 - Take Exit 88. Go West on Route 12 toward Rochester. Drive through Rochester and continue 8 miles west until you see the signs for the Chehalis Tribal Center/Lucky Eagle Casino (Anderson Road). Turn left onto Anderson Road and go straight until you reach the stop sign at the intersection of 188th Ave. SW. Turn left on 188th Ave SW to the Chehalis Lucky Eagle Casino.
From Route 8 - Take Route 12 exit. Drive through Oakville and continue east 5 miles until you see the signs for the Chehalis Tribal Center/Lucky Eagle Casino (Anderson Road). Turn right onto Anderson Road and go straight until you reach the stop sign at the intersection of 188th Ave. SW. Turn left on 188th Ave SW to the Chehalis Lucky Eagle Casino.
|
http://www.co.grays-harbor.wa.us/info/pub_svcs/ChehalisBasin/Index.html |
Documents produced for the CBP are available here |
|
A summary of the Chehalis Basin Limiting Factors Analysis is available here, along with information on how to order the complete report. |
|
|
Salmon Recovery Funding Board |
|
|
This is an excellent site that provides a lot of information and links to other sites. It posts the Chehalis Basin Partnership meeting agendas and summaries |
Attachments included with this mailing:
· Meeting Summaries for November 16 and December 21, 2007 CBP and January 3, 2008 for the STC
· Link to Chehalis Basin site sponsored by USGS http://wa.water.usgs.gov/projects/chehalis/